Monday, May 28, 2012

Phase 5: Plumbing Time

With the framing complete, the plumbers started their work.


In order for the plumbers to get to work, they had a massive delivery of piping. I still find it hard to imagine that all the parts that arrive at our place are all going to be used. Somehow these bits and pieces miraculously make it from the boxes into the walls and floors, creating the foundation of our home.


On the first floor, Levi marvels at his surroundings. The white pipes just beyond our pup are for the kitchen sink and dishwasher.


Here the piping lines the north wall of the first floor in order to enter the second floor laundry room and powder room.



On the second floor, the Jack-N-Jill bathroom is taking form. The bathtub has been placed so the plumbing can be created around it. You can also see the plumbing for the double vanity. The copper pipes carry the hot and cold water to the faucets and the PVC removes the waste.



On the third floor, the front bathroom is also coming along. The claw foot tub has been put in as have the PVC & copper pipes.


A window has been removed in the adjacent bedroom. We find it rather odd and disconcerting. When looking from the street, my eye wants to fill in the hole and fix it.


There is also plumbing in the master bath. The above piping is for the double vanity.



Copper pipes have also been installed in the master shower. 


We had a friendly visitor on our back deck. Time sure is flying by; summer is around the corner. Three months into our project, the rehab is on schedule. Fingers are crossed that things continue on this course. 

No comments: